NOTICE TO CONTRACTORS:
Sealed bids will be received by the Board of Supervisors of Scott County,
Mississippi at the Scott County Courthouse, Forest, Mississippi, until 10:00 am on
the 24th day of January, 2020 and shortly thereafter publicly opened for the
construction of 0.303 miles of WIDENING THE EXISTING HIGHWAY TO ADD RIGHT AND LEFT
TURN LANES on the U.S. HWY 80 BETWEEN LAKE, MS AND FOREST, MS being known as Project
No. DECD-0062(18)B in Scott County, Mississippi.
PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:
ITEM QUANTITY UNIT
______________________________________________________________________
ROADWAY ITEMS:
MOBILIZATION LUMP SUM LS
CLEARING AND GRUBBING LUMP SUM LS
REMOVAL OF BOX CULVERT WINGS 4.000 UN
STA.256+00.00
REMOVAL OF 24" CONCRETE PIPE, 1.000 UN
FLARED END SECTION
BORROW EXCAVATION (F.M.E.) 2,488.000 CY
(CONTRACTOR FURNISHED) (CLASS 9)
EXCESS EXCAVATION (LVM) 1,573.000 CY
GRANULAR MATERIAL (LVM), 287.000 CY
(CLASS 5, GROUP C)
CRUSHED STONE 1,462.000 TON
SIZE (I) STABILIZER AGGREGATE, 80.000 TON
COARSE
HOT MIX ASPHALT, MT,9.5MM 643.000 TON
HOT MIX ASPHALT,MT,12.5MM 337.000 TON
HOT MIX ASPHALT,MT,19MM 419.000 TON
HOT MIX ASPHALT,MT,9.5MM, LEVELING 218.000 TON
COLD MILLING OF BITUMINOUS 5,483.000 SY
PAVEMENT, ALL DEPTHS
RUMBLE STRIPS, GROUND-IN 0.372 MI
CLASS B STRUCTURAL CONCRETE 36.600 CY
CLASS "B" STRUCTURAL CONCRETE, 0.410 CY
MINOR STRUCTURES
REINFORCING STEEL 4,799.000 LB
18" REINFORCED CONCRETE PIPE, 128.000 LF
CLASS III
24" REINFORCED CONCRETE PIPE, 456.000 LF
CLASS III
30" REINFORCED CONCRETE PIPE, 64.000 LF
CLASS III
24" REINFORCED CONCRETE PIPE, 3.000 EA
END SECTION
Page 1 of 3
SECTION 900
PROJECT NO. DECD-0062(18)B
SCOTT COUNTY
MAINTENANCE OF TRAFFIC LUMP SUM LS
ADDITIONAL CONSTRUCTION SIGNS 0.000 SF
6" WIDE THERMOPLASTIC TRAFFIC 0.922 MI
STRIPE (CONTINUOUS WHITE) (90 MIL)
6" WIDE THERMOPLASTIC TRAFFIC 0.392 MI
STRIPE (CONTINUOUS YELLOW)
(90 MIL)
THERMOPLASTIC DETAIL STRIPE 380.000 LF
(4" EQUIVALENT LENGTH)
(WHITE) (90 MIL)
THERMOPLASTIC DETAIL STRIPE 1,260.000 LF
(4" EQUIVALENT LENGTH)
(YELLOW) (90 MIL)
THERMOPLASTIC LEGEND 402.000 SF
(WHITE) (120 MIL)
RED-CLEAR REFLECTIVE HIGH 74.000 EA
PERFORMANCE RAISED MARKERS
TWO-WAY YELLOW REFLECTIVE HIGH 180.000 EA
PERFORMANCE RAISED MARKERS
REFLECTORIZED TRAFFIC REGULATORY 1.000 EA
SIGN (ENCAPSULATED LENS)
REFLECTORIZED TRAFFIC OBJECT MARKER 4.000 EA
(ENCAPSULATED LENS)(TYPE 3)
EROSION CONTROL ITEMS:
AGRICULTURAL LIMESTONE 2.340 TON
COMMERCIAL FERTILIZER (13:13:13) 1.170 TON
AMMONIUM NITRATE 0.180 TON
SEEDING 1.170 AC
VEGETATIVE MATERIALS FOR MULCH 2.340 TON
SOLID SODDING 192.000 SY
TEMPORARY SILT FENCE 100.000 LF
(TYPE II) (AOS 0.15-0.84)
WATTLES, 20" 500.000 LF
LOOSE RIPRAP, 200 LB. 350.000 TON
Page 2 of 3
PROJECT NO. DECD-0062(18)B
SCOTT COUNTY
NOTICE TO CONTRACTORS:
CONTRACT TIME: 85 Working Days
BASIS OF AWARD
The award, if made, will be made to the lowest qualified bidder on the basis of
published quantities.
The Board of Supervisors hereby notifies all bidders that it will affirmatively
insure that in any contract entered into pursuant to this advertisement, minority
business enterprise will be afforded full opportunity to submit bids in response to
this invitation and will not be discriminated against on the grounds of race, color,
or national origin in consideration for an award.
PLANS AND SPECIFICATIONS are on file in the Office of the Chancery Clerk of Scott
County, the County Engineer's office and the Office of the State Aid Engineer, 412
E. Woodrow Wilson Avenue, Jackson, Mississippi. This project shall be constructed
in accordance with the latest edition of the Mississippi Standard Specifications
for State Aid Road and Bridge Construction.
PLANS AND PROPOSALS may be secured from Kevin C. Thompson, County Engineer for Scott
County, Mississippi, 1724B 23rd Avenue, Meridian. The Cost is twenty-five dollars
($25.00) for plans and twenty-five dollars ($25.00) for the proposal, non-refundable
Certified check or bid bond for five percent (5%) of the total bid, made payable to
Scott County and the State of Mississippi must accompany each proposal.
Bidders are hereby notified that any proposal accompanied by letters qualifying in
any manner the condition under which the proposal is tendered will be considered an
irregular bid and such proposal will not be considered in making the award.