Replace Multiple Boilers at Various Campuses - MGCCC
Mississippi > Mississippi Gulf Coast Community College
Solicitation: 86561758
Listing Information/Advertisement:


Project involves replacing 4 boilers: one boiler at Bldg K at Jefferson Davis Campus, Gulfport, MS, one Boiler at Bldg F, Jackson County Campus, Gautier, and two boilers at Perkinston Campus, Perkinston,MS with one boiler for Owen Hall and one boiler for Moran Hall.  The projects shall include demolition of existing boilers with replacement that will include new pumps, flues, gas line connections, hot water supply and return runouts/mains, valves, recharging of chemical of loop, and integration of Bacnet ready boilers into the Siemens front end.  New pumps shall include all accessories per drawings and specifications and connection into Siemens front end.  Insulate all piping and fittings per specifications.  Disconnect and reconnect all electrical from old and reconnect to new boiler with new disconnect and conductors.  New pumps shall be addressed similar to boilers using new vfd for disconnect and connection to Siemens front end.  VFD shall be for balancing purposes.  At Moran Hall all of the exterior roof mounted hot water piping shall be reinsulated its in entirety and shall include aluminum jacket with new roof supports.   

SUBMITTAL INFORMATION
Creator Username: MGCCCBK
Bidding Privacy: Bid encryption
Started: 06-Dec-2018 6:00:00 PM CST
Ends: 17-Jan-2019 2:00:00 PM CST ( Expired )
History: 1671 Views
Event Status: Expired since 17-Jan-2019 2:00:00 PM CST
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
15-Jan-2019 6:47:57 PM CST
for information only - plan holders known to this office
15-Jan-2019 3:10:45 PM CST
adds dates for addenda #1 and #2 for bid form, revises Jackson County plan with fully condensing boiler and revised flue routing
09-Jan-2019 12:10:39 PM CST
Addendum #2 had erroneous time for the Perkinston Campus walk through listed as 9:00 am - the correct time will be 1:00 pm Jan 10, 2019, Jefferson Davis will be 9:30 am Jan 10.
08-Jan-2019 5:12:15 PM CST
any references to "furnished by owner" in specs and drawings should be omitted - contractor shall furnished all materials and labor, adds condensing boiler specification, establishes job site visits with schedules and locations.
08-Jan-2019 5:11:34 PM CST
any references to "furnished by owner" in specs and drawings should be omitted - contractor shall furnished all materials and labor, adds condensing boiler specification, establishes job site visits with schedules and locations.
21-Dec-2018 1:05:10 PM CST
addendum #1 posted - changes bid date to January 17, 2019 @ 2:00, references Central Bidding as electronic bid alternative.
21-Dec-2018 12:15:04 PM CST
disabled public message board
 
BID HISTORY
Username Bid Amount Type Company name Bid Amount Bid Placed
WeaverMechanical
For entire project Ray C. Weaver Mechanical Contractors, Inc. =SEALED= 17-Jan-2019 12:48:34 PM CST
 
Owner:
Mississippi Gulf Coast Community College
Perkinston, MS

Project:
"Replace Boilers at Various Campuses - MGCCC"
To be Opened on January 17, 2019 at 2:00 PM

Bidder:
Ray C. Weaver Mechanical Contractors, Inc.
C.O.R. No.:  03388-MC
Delivery: 0 Days
Gottfried
For entire project Gottfried Contracting =SEALED= 17-Jan-2019 1:19:46 PM CST
 
Gottfried Contracting, LLC
6 Meyers Road
Covington, LA  70435
Mississippi Certificate of Responsibility No:  17776-MC

Sealed Bid For:
Replace Multiple Boilers at Various Campuses - MGCC
To be delivered Thursday, January 17, 2019 - 2:00 PM

Deliver to:
Perkinston Campus
Maintenance Facility Office
51 Main Street
Perkinston, MS  39573
Delivery: 0 Days
Bids Added by Agency/Owner
Username Bid Amount Type Company name Bid Amount Bid Placed