OPSO Main Kitchen Building Demolition
Louisiana > Orleans Parish Sheriff's Office
RFP: 84604420
Listing Information/Advertisement:


As per the plans and specifications prepared by Perez Architects, the Project scope of work will include, but not limited to the following:

Demolition of the Main Kitchen Building located at 2801 Perdido Street, New Orleans, Louisiana.   The bid documents will included technical
specifications and existing structure and electrical conditions.  Earthwork information is included for the site.  Two Attacments include the
SWPPP (Storm Water Pollution Protection Plan Application Form) and the Environmental ACM Abatement reports.

The NON-MANDATORY pre-proposal conference and tour of the facilities will be help on Tuesday, June 5, 2018 at 1:00 pm or Wednesday, June 6, 2018 at 2:00 pm.

Any questions and/or concerns must be posted on the public message board on this site no later than June 28, 2018 at 4:00pm to ensure proper time for answers.  All communication is to be directed to this message board for transparency and fairness.

 

Additional Notes/Requirements
The pre-proposal conference and tour on June 5th and June 6th will occur at the Main Kitchen building site that is located at 2801 Perdido Street, New Orleans, Louisiana, 70119. The conference and tour will begin at the South Dupree Street and Perdido Street warehouse entrance. Thank you all for your patience! I have attached (6/29) the answers to all of your questions concerning this RFP. Please note that the bid is now opening on July 17, 2018 at 2:00pm due to this addendum. The latest Addendum No.4 (combined) has been added again. This is an update that removes the note regarding sod. After much discussion, Addendum No. 5 has been added to make sure that we are all on the same page regarding C-100.
PUBLIC MESSAGE BOARD
Discuss questions with the owner/creator of this Listing.
zimmereschette on 07-Jun-2018 11:39:20 AM CDT
Question 1: Section 00200 page 2, 5.1 shows unit price form must be provided no later than Noon, What are the unit price for and when do they need to be submitted? Question 2: Section 00200 page 6, 10.3.1 Property insurance. Is it correct that the owner is requiring us to provide All Risk Builders Risk and Flood insurance on a building we are totally demolished? Question 3: Section 00200 page 10, SLDBE Commitment Form. Exactly when does this form need to be submitted? Before bid or post bid before 72 hours. Question 4: Section 012000 page 1, 1.1. OPSO is mandating a 3rd party scheduling consultant. Is this correct? And what is consultant to do beside make a schedule of our work. There is a reference in the specs about Gantt Schedule on section 013200 page 3, 2.3. Will this be acceptable in lieu of a scheduling consultant? Question 5: Section 024116 page 2, 1.5 E. does this project require a community meeting and if so will 21 days be added to the 84 days, in order for us to arrange the community meeting? 7 to arrange 14 days to meet before demo starts.
rjseibertjr on 07-Jun-2018 2:56:31 PM CDT
What about this 5 million workers comp,and 5 million auto insurance. My agents are telling me there is no such thing.
zimmereschette on 08-Jun-2018 8:04:06 AM CDT
Question 6: on A 3.01 there are pictures 3-084 & 4-083 showing the loading dock for the NOLA CCC building. on D-100 the north column line 0,1, 2, 3, 4, 5, & 6, from S Dupre St going east call for (note 11)to be demolished etc. The question is does the loading dock and concrete drive connected top NOLA CCC get demolished. If not we cant remove the pile caps they are under these structures. Also, is the roof of the loading dock structural connected to the kitchen building? at site visit we were not able to go in this area for close viewing. Please advise
zimmereschette on 08-Jun-2018 8:06:38 AM CDT
My question #6 is referring to column line A
SSCommercial on 11-Jun-2018 1:42:20 PM CDT
Can a contractor licensed under demolishing work bid this project. You have it listed on the bid package that the contractor should be licensed in for Building Construction. Please clarify.
SSCommercial on 11-Jun-2018 1:45:05 PM CDT
What is the requirement for the site after the demolition is complete? Is it going to be green space? Is the site required to be sodded and if so, what is the specification for the sod?
SSCommercial on 11-Jun-2018 1:45:44 PM CDT
Are you requesting and alternate to make a parking lot on the site? If so where are the requirements for the parking lot?
SSCommercial on 11-Jun-2018 4:52:50 PM CDT
On drawing G0.01 it states that Alternate No 1: Work Includes the creation of a fenced parking Lot. What are the specs that you are requesting for the parking lot to be built to? Do you want an asphalt parking lot, concrete parking lot, gravel parking lot and do you want the entire area to be included in the parking lot area? I then assume you want the entire area to be fenced with entry gates as well. Please clarify. Then on that same drawing it states: Alternate No 2: Work includes a green space. Do you have any specs on this green space area you are requesting? Is the sodding that is mentioned in the scope of work to be included in this green space or is the sodding to be figured in the base bid no matter if a green space alternate is accepted or not? I then assume if an alternate is submitted for a fenced in parking lot, the sodding number should be considered as a credit out of the base bid and the cost of the parking lot then will take the place of that scope if it is accepted. Are you going to post any further addendums to the project that may include this additional information along with the sign in sheet form the pre bid?
rjseibertjr on 12-Jun-2018 2:46:29 PM CDT
It's been a week, where is the addendum?
ConcreteBusters on 13-Jun-2018 9:28:42 AM CDT
Please provide a response to the following questions/concerns regarding the Subject Project. 1) Dwg. C-100 states “site to be covered with sod” I assume this is part of the Base Bid. 2) Alternate No.2 states “work includes a green space”. Wouldn’t the sodding of the site in the Base Bid constitute a green space? Is the sodding part of the Base Bid or is it an Alternate? 3) Under Section 024116 Structure Demolition Part 3 section 3.1 Demolition Contractor A.2 states “Demolition Contractor must have been certified for lead paint abatement by the EPA or the City of New Orleans and must follow EPA and city of New Orleans guidelines for removal and disposal of lead based materials.” There is no confirmation of the existence of lead paint in the proposed building to be demolished. This appears to be a moot requirement. We formally request this requirement be dropped from the specifications. 4) Under Section 024116 Structure Demolition Part 3 section 3.1 Demolition Contractor A.3 states “Demolition Contractor must be certified in the removal of asbestos and material containing asbestos.” Since all samples tested by the Designer have been deemed ND (None Detected) (free from the presence of asbestos) this appears to be a moot requirement. We formally request this requirement be dropped from the specifications. 5) Please provide guidelines/ specifications for Alternates No. 1 and No.2. Concrete / Asphalt with thickness, and type of sod for green space. This would be good for starters. 6) Under Section 012300 Alternates Part 3 Execution 3.1 states “SCHEDULE OF ALTERNATES (Not Used). “ The Bid Documents require pricing for Alternates No. 1 and No.2 7) Addendum No. 1 Under QUESTIONS & CLARIFICATIONS: 1.a states “The SLDBE Commitment Form must be provided (by all bidders) no later than noon, Tuesday June 17, 2018… June 17, 2018 is a Sunday not a Tuesday. Please provide the correct submission date and time.
ConcreteBusters on 13-Jun-2018 9:32:05 AM CDT
Your timely response to the aforementioned issues will be greatly appreciated. Thanks!
ConcreteBusters on 21-Jun-2018 1:27:51 PM CDT
Clarification needed for Section 9.1 of Instructions to bidders, page 12. Statement - "Bonds shall remain in force for one (5) year after completion and acceptance of the work by the Owner." Please clarify which is correct: one year or five years. Thanks.
SSCommercial on 22-Jun-2018 12:17:08 PM CDT
Can you please give us an idea as to when the questions that have been submitted will be answered? The bid date is again fast approaching.
SSCommercial on 29-Jun-2018 5:24:30 PM CDT
So are we going to get any clarifications on the proposed questions before the bid date? Just saying? We are now 10 days out with 2 weekends and a holiday out. Seems a little ridiculous.
SSCommercial on 11-Jul-2018 8:24:30 AM CDT
Just to be clear, is everyone supposed to price the backfill based on a 14' level site grade after the demolition is complete and then bring it up to the grades as it is set forth on the drawing included in Addendum #5 put out yesterday. I am taking it that the grades on the new drawing will be mandatory elevations at completion. Is that correct?
opcsomarygoodwin on 11-Jul-2018 2:57:09 PM CDT
In reference to your question this morning, SSCommercial. Please follow the Addendum Number 5 that was posted on Monday (7/9) for final grades and elevations.
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
18-Jul-2018 4:52:28 PM CDT
RFP responses have been itemized and posted
09-Jul-2018 4:32:08 PM CDT
Addendum No. 5 has been adding so that we all understand the OPSO needs
09-Jul-2018 10:40:21 AM CDT
Addendum Number Four has been re-added without the sod note.
06-Jul-2018 3:03:44 PM CDT
Addendum No. 4 has been added and the bid opening has been moved to July 17, 2018 at 2:00pm
29-Jun-2018 6:50:56 PM CDT
addendum no. 3 has been uploaded with all of the questions and answers for this RFP
12-Jun-2018 5:31:04 PM CDT
sign in sheets scanned and posted; addenddum no. 2 posted;La Public Work Bid Form posted
01-Jun-2018 11:32:02 AM CDT
bid opening changed to corrected date of June 19th at 2:00pm
18-May-2018 1:01:53 PM CDT
Addendum No. 1 is posted changing the pre bid meetings (now 5/5 and 5/6) and the bid opening date is now June 19th at 2:00pm
04-May-2018 5:14:31 PM CDT
pre-proposal tour location of 2801 Perdido Street was added to the description
04-May-2018 5:00:35 PM CDT
final copies of specifications and drawings have been posted