New Water Treatment Plant for the Milton Water System - Drinking Water Revolving Loan Fund
Louisiana > Mader Engineering - Central Bidding Plan Room
Sealed Bid: 82234830
Listing Information/Advertisement:


ADVERTISEMENT FOR BIDS
Project No.  (3339-04)
Milton Water System (herein referred to as the "Owner")
 
Notice is hereby given that electronic bids will be received by the Owner via the Mader Engineering Plan Room at www.madereng.com until 10:00 a.m. on Thursday the 24th day of March 2022 for the construction of the project described as follows:
 
NEW WATER TREATMENT PLANT
FOR THE
MILTON WATER SYSTEM
DRINKING WATER REVOLVING LOAN FUND
 
Properly submitted electronic bids will be publicly opened and read aloud by an online webinar platform. Email Mader Engineering at [email protected] for more information regarding joining instructions. The Information for Bidders, Form of Bid Proposal, Form of Contract, Plans, Specifications, Performance and Payment Bond, and other contract documents may be downloaded from the Mader Engineering Plan Room as hosted by Central Bidding (subject to fees and conditions).
 
This will be the only method of plan distribution and the only method for bid submittal.
 
The Owner reserves the right to reject any and all bids for just cause. Such actions will be in accordance with Title 38 of the Louisiana Revised Statutes.
 
Each Bidder must deposit with his/her bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. Sureties used for obtaining bonds must appear as acceptable on the U.S. Department of Treasury Circular 570.
 
Contractor's classification shall be Municipal and Public Works Construction.
 
No bidder may withdraw his/her bid within forty-five (45) days after the actual date of the opening thereof.
 
All contractors and subcontractors will be required to comply with the Title VI of the Civil Rights Act of 1964, the Davis-Bacon Act pertaining to the minimum wage rates, the Anti-Kickback Act, the Contract Work Hours Standards Act and the Local Public Works Payroll Evaluation Program. Further, all contractors and subcontractors will be required to certify that they do not and will not maintain or provide for their employees any facilities that are segregated on a basis of race, color, creed, or national origin.
 
The Contractor shall begin mobilization and procurement of materials within ten (10) working days of the receipt of the Notice to Proceed. Attention to Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract, Section 3, Segregated Facilities, Section 109, Executive Order 11246, and all applicable laws and regulations of the Federal government and State of Louisiana and bonding and insurance requirements. Attention to Bidders is also called to the requirements of the various EPA forms as found in Section V of these specifications and contract documents.
 
All bidding contractors must comply with:
Presidential Executive Orders 11625, 12138, and 12432; Women's and Minority Business Enterprise.
Presidential Executive Order 12549, Debarment and Suspension.
Presidential Executive Order 11246, Equal Employment Opportunity as amended by Presidential Executive Order 11375
Presidential Executive Order 13202, as amended by E.O. 13208, Preservation of Open Competition.
All OSHA requirements. 
Any person with disabilities requiring special accommodations must contact the Mader Engineering., Inc. no later than seven (7) days prior to the bid opening.
 
Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard for race, color, religion, sex, or national origin.  Bidders on this work will be required to comply with the President’s Executive Order No. 11246, as amended.  The requirements for bidders and contractors under this order are explained in the specifications.
 
IN PARTICULAR, BIDDERS SHOULD NOTE THE REQUIRED ATTACHMENTS AND CERTIFICATIONS TO BE EXECUTED AND SUBMITTED WITH THE FORM OF BID PROPOSAL. ALSO MINORITY AND FEMALE OWNED AS WELL AS SECTION 3 (LOCAL FIRMS) CONTRACTING FIRMS ARE ENCOURAGED TO SUBMIT BIDS.
 
The bidding documents include a Wage Determination for the project based on the current U.S. Department of Labor wage rates obtained from Wage Determinations Online (beta.SAM.gov). The Wage Determination will be rechecked ten days before the bid opening, and if it has been revised, the revised version will be issued to bidders as an addendum.
 
Bidders are advised that the project is also being funded in part by the Drinking Water Revolving Fund Program of DHH.
 

UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
28-Mar-2022 8:36:59 AM CDT
Please note that the project is still scheduled to bid at 10:00 a.m. this Thursday, March 31, 2022. We greatly appreciate the interest in the project and the prospect of good competition. We received an unusually heavy volume of RFIs and requests for approvals. We have attempted to answer all questions that appeared relevant. For questions left unanswered at this point in time, the response to such unanswered questions is please bid according to the plans and specifications. THIS IS NOT AN ADDENDUM.
25-Mar-2022 4:58:30 PM CDT
Uploaded Addendum No. 3. making various clarifications and revisions.
18-Mar-2022 10:18:33 AM CDT
Uploaded Addendum No. 2. making various clarifications and revisions.
10-Mar-2022 1:34:26 PM CST
Uploaded Addendum No. 1. setting a pre-bid conference and postponing the bid date to 03/31/2022 at 10:00 am.