Fish Lab Complex, Rockefeller Wildlife Refuge
Louisiana > Facility Planning and Control - Division of Administration
Solicitation: 80082565
Listing Information/Advertisement:


The Work of Project is defined by the Contract Documents and consists of the following:
Concrete pile, beam foundation system.
Hollow core plank floor.
Steel sheet pile retaining system.
Prefabricated metal building structure.
Standing seam metal roof.
Lab: High efficiency ductless HVAC system with makeup air units.
Incubator: Preheated makeup air exchange.
Closed cell spray foam insulation.
Preheated water supply system – expandable.
Water treatment plant – expandable.
Emergency backup generator system – rough-in only. Generator equipment, fuel tank and platform to be installed at a future date.
High efficiency lighting fixtures

UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
25-Aug-2016 8:52:19 AM CDT
added addenda no. 7
19-Aug-2016 11:38:52 AM CDT
added addenda no. 6
16-Aug-2016 9:13:09 AM CDT
added addenda no. 5 extending the bid date
12-Aug-2016 11:36:37 AM CDT
added addenda no. 4
09-Aug-2016 3:23:12 PM CDT
added addenda no. 3
26-Jul-2016 10:45:48 AM CDT
26-Jul-2016 10:43:22 AM CDT
added addenda no. 2 including change of bid opening date.
21-Jul-2016 5:47:55 PM CDT
28-Jun-2016 9:05:44 AM CDT
added addenda No. 1, removed and replaced entire specification book.