TO: All Prospective Bidders
PROJECT: Park Road Bridge Replacement (Kinder, LA)
CLASSIFICATION: Highway, Street, and Bridge Construction, or
Heavy Construction
PROJECT ENGINEER: Wm. Luke Miller, P.E.
ENGINEER’S ESTIMATE: $400,000.00 to $500,000.00 (Base Bid)
BID DATE: Tuesday, April 16, 2024 @ 10:00 A.M
BID LOCATION: Allen Parish Police Jury
602 Court Street
Oberlin, LA 70655
PREBID MEETING: Tuesday, March 26, 2024 (Non-mandatory) @ 10:00 a.m.
Allen Parish Police Jury Office
MAJOR ITEMS OF WORK: Demolition of Existing Timber Framed Bridge
Demolition of Existing Timber Piles
Demolition of Existing Timber Abutment Walls
Regrading Existing Channel
Construction of Single Span Steel Girder Bridge
Construction of Concrete Bridge Deck on Steel Plate Deck
Construction of Concrete Abutment Wall and Pile Cap
Installation of New Timber Piles
Salvage and Relocate Existing Guardrails
Temporary Traffic Controls and Dewatering
Vibratory Monitoring During Pile Driving (3rd Pary)
The Bid Proposals, Plans, Specifications, Forms of Contract, and Forms of Bid Bond, Performance Bond and Payment Bond, and other contract documents may be examined at the office of the Engineer:
Meyer, Meyer, LaCroix & Hixson, Inc.
Telephone (318) 448-0888
100 Engineer Place
Alexandria, Louisiana 71303
A USB flash drive of the bid documents may be obtained from the office of the Engineer. The cost per USB flash drive will be $40.00 non-refundable, which cost represents the cost of reproduction and handling. Any requests for bid documents shall be accompanied by payment in full.