OTTIS AND WILLIE MATTHEWS ROAD CULVERT REPLACEMENT FEMA PW # 02004
Louisiana > St. Helena Parish Police Jury
RFP: 63802800
Listing Information/Advertisement:


Ottis and Willie Matthews Road Culverts Replacement
St. Helena Parish Police Jury (herein referred to as the "Owner")
Sealed bids marked "Sealed Bid – Ottis and Willie Matthews Road Culverts Replacement,
St. Helena Parish, LA” will be received by the Owner for the construction of the project
described as follows:

Ottis and Willie Matthews Road Culverts Replacement

St. Helena Parish Police Jury
FEMA PW# 02004
HDCA Project No. 2023-13

Bids shall be addressed to St. Helena Parish Police Jury and delivered to St. Helena Parish
Police Jury located at 17911 LA-43 Greensburg, LA 70441 not later than 2:00 CST on the
__14th___ day of November , 2024 . Any Bid received after the specified time
and date will not be considered. The sealed Bids will be publicly opened and read aloud at
__2:15 PM________ CST on the 14th day of November , 2024 , at
177911 LA-43 Greensburg, LA 70441___________ .
The Information for Bidders, Bid Form, Form of Contract, Plans, Specifications, and Forms of
Bid Bond, Performance Bond and Payment Bond, and other Contract Documents may be
examined at the Office of the Engineer, H. Davis Cole & Associates, LLC located at 1340
Poydras Street, Suite 1850, New Orleans, LA 70112. Copies may be obtained at this office
upon payment of a deposit of $100.00. This deposit will be refunded upon request in accordance
with R.S. 38:2212.
Bidders also have the option to review Bid Documents and submit bids electronically by visiting
Central Auction House.
The Owner reserves the right to reject any and all bids for just cause; such actions will be in
accordance with Title 38 of the Louisiana Revised Statutes.
Each Bidder must have an active Unique Entity ID Number (UEI), as verified on www.sam.gov,
prior to the beginning of construction.
Each Bidder must deposit with his/her bid, security in the amount, form, and subject to the
conditions provided in the Information for Bidders. Sureties used for obtaining bonds must
appear as acceptable on the U. S. Department of Treasury Circular 570.
No Bidder may withdraw his/her bid within forty-five (45) days after the actual date of the
opening thereof.
The Contractor shall begin mobilization and procurement of materials within ten (10) working
days of the receipt of the Notice to Proceed.
The Attention of Bidders is called particularly to the requirements for conditions of employment
to be observed and minimum wage rates to be paid under the Contract, Section 3, Segregated
Facilities, Executive Order 11246, and all applicable laws and regulations of the Federal
government and State of Louisiana and bonding and insurance requirements.

Any person with disabilities requiring special accommodations must contact the St. Helena Parish
Police Jury no later than seven (7) days prior to bid opening.

SUBMITTAL INFORMATION
Creator Username: rdmatthews
Bidding Privacy: Bid encryption
Started: 17-Oct-2024 2:00:00 PM CDT
Ends: 26-Nov-2024 2:00:00 PM CST ( Expired )
History: 1067 Views, 4 Messages
Event Status: Expired since 26-Nov-2024 2:00:00 PM CST
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
PUBLIC MESSAGE BOARD
Discuss questions with the owner/creator of this Listing.
RichardPriceContracting on 04-Nov-2024 11:56:12 AM CST
Please confirm the bid date is November 14, 2024. The "Advertisement for Bids" in the Specifications, states that the sealed Bids will be publicly opened and read aloud at 2:15 PM CST on the 13th day of November 2024.
rdmatthews on 04-Nov-2024 12:10:19 PM CST
The bids are due by 2:00 PM on November 14, 2024, and will be opened at 2:15 PM on the same day.
lkingcollc on 04-Nov-2024 1:11:33 PM CST
On sheet 4 of the prints there is a note under the heading of earthwork that states that we remove all water to a depth of 2 feet below excavation, my questions are. 1-Is this note going to be adhered to in this project. 2- If we do have to follow this note, do we have soils reports to base pump values on and to produce a pump down time frame.
Arbour2020 on 05-Nov-2024 2:52:51 PM CST
Was the previous answer to Contractor's question about the bid date and the subsequent "marked up" Advertisement for Bids page to be shown on our bid as Addendum No.1? It was not called Addendum No.1. Also, the Information For Bidders page says the bid date is 7th of November, 2024 but was not corrected to say 14th of November, 2024.
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
19-Nov-2024 10:01:40 AM CST
Updated bid end time to Nov 26 2:00
14-Nov-2024 4:01:28 PM CST
Date Change
12-Nov-2024 4:46:22 PM CST
001-Addendum 3
08-Nov-2024 12:40:35 PM CST
Addendum No. 1
04-Nov-2024 12:22:30 PM CST
Addendum with date correction.