Demolition of Tent Foundations and Payment-Package 1; Intake Processing Center, Templeman III & IV Replacement
Louisiana > Orleans Parish Sheriff's Office
Solicitation: 58805704
Listing Information/Advertisement:


The project scope includes demolition and removal of (4) four tent foundations, adjacent asphalt pavement and associated utilities. The scope also includes installation of a new security fence to secure the four remaining tents along with demolition and removal of the existing security fence surrounding the (4) tents which have been removed. The scope of work shall also include erosion control.

SUBMITTAL INFORMATION
Creator Username: opcsomarygoodwin
Bidding Privacy: Bid encryption
Started: 21-May-2014 12:00:00 AM CDT
Ends: 25-Jun-2014 2:00:00 PM CDT ( Expired )
History: 2841 Views, 6 Messages
Event Status: Expired since 25-Jun-2014 2:00:00 PM CDT
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
DOWNLOAD BID DOCUMENTS
00 0100 table of contents.pdf (39.7 KB)
00 0101 access agreement.pdf (60.0 KB)
00 0456 noncollusion affidavit.pdf (62.4 KB)
00 0500 agreement form.pdf (43.7 KB)
00 0615 performance bond and payment bond.pdf (44.2 KB)
00 0700 general conditions.pdf (58.7 KB)
00 1000 advertisement for bids (cfc).pdf (100.4 KB)
00 2000 instruction to bidders (cfc).pdf (111.2 KB)
00 3000 la uniform bid form (cfc).pdf (395.4 KB)
00 4000 bid bond.pdf (70.0 KB)
00 4200 public entity crime statement (cfc).pdf (64.2 KB)
00 4300 subcontractor list (cfc).pdf (55.4 KB)
00 4520 corporate resolution (cfc).pdf (64.1 KB)
00 6120 sldbe (cfc).pdf (80.3 KB)
00000 cover sheet.pdf (6.6 MB)
01 0270 application for payment (cfc).pdf (73.9 KB)
01 0350 modification procedures (cfc).pdf (65.4 KB)
01 0400 project coordination (cfc).pdf (78.7 KB)
01 0450 cutting and patching (cfc).pdf (68.6 KB)
01 1331 request for electronic data.pdf (62.4 KB)
01 1400 quality requirements.pdf (86.9 KB)
01 1421 reference standards and definitions.pdf (78.7 KB)
01 1500 temporary facilities and controls.docx.pdf (96.2 KB)
01 1520 security.pdf (87.4 KB)
01 1610 product requirement.pdf (87.7 KB)
01 1630 product substitution procedures.pdf (80.7 KB)
01 1749 construction waste management and disposal.pdf (72.5 KB)
01 1770 closeout procedures.pdf (103.1 KB)
01 1778 closeout submittals.pdf (73.0 KB)
01 1782 operation & maintenance data.pdf (75.7 KB)
01 1790 demonstration & training.pdf (64.9 KB)
01 1800 electronic reporting.pdf (50.9 KB)
01 2130 project meetings (cfc).pdf (65.6 KB)
01 3000 administrative requirements.pdf (82.6 KB)
01 3130 request for information procedures and form (cfc).pdf (76.1 KB)
01 3210 construction schedule (cfc).pdf (79.6 KB)
02 8300 - chain link fence (cfc).pdf (102.2 KB)
100 g-101 cover sheet.pdf (6.1 MB)
101 survey - survey.pdf (1.7 MB)
102 dc100(1) phase i demolition plan.pdf (1.5 MB)
103 ec100(1) erosion control plan.pdf (1.4 MB)
104 ec200(1) erosion control & details.pdf (1.9 MB)
13046 - 02 41 17 - sitework demolition.pdf (17.6 KB)
13046 - 31 10 00 - site clearing.pdf (18.3 KB)
13046 - 31 23 16 - excavating.pdf (17.1 KB)
opso2014-12prebidsignsheet.pdf (97.1 KB)
opso demolition of tent foundation - addendum no.1.pdf (57.1 MB)
opso demolition of tent foundation - addendum no.1.pdf (57.1 MB)
tentdemonewspaper.pdf (98.2 KB)
demolition of tent foundation - package i - addendum no. 2.pdf (188.8 KB)
demonotarized.pdf (102.2 KB)
PUBLIC MESSAGE BOARD
Discuss questions with the owner/creator of this Listing.
DurrHeavyConstruction on 09-Jun-2014 3:30:16 PM CDT
Questions: 1. Reference the Bid Bond. Part 7.1 Do we use the document enclosed with the bid or the AIA document 310? 2. In Part 10 Time and Liquidated damages the time duration is 270 days but what are the liquidated damages? 3. What is a LLC Certification and where can we can one? 4. Part 9 references insurance in Part 7.72, but it is not in that section. Part 7.7.2 deals with bond and the time to send in insurance forms. Please clarify. 5. On drawing sheet DC100(1) it denotes a security fence at 12 feet, but in the demo legend note number 12 states the fence be at 8 feet. Also on sheet EC200(1) the security fence detail puts the fence at 12 feet. Please clarify. 6. What is the slab thickness and what type of foundation does it have? 7. Are there any pilings and if so what do we do with them? 8. Do we saw-cut on the NE side ( Perdido St.) 9. Should the saw-cut be 1" depth of full depth? 10. Please let me know you got these questions. I am sending them on 6-9-2014 at 3:28 PM. Thank you, Chip Donewar, Durr Heavy Construction, LLC, (504) 737-3205, [email protected]
ConcreteBusters on 11-Jun-2014 11:32:29 AM CDT
Table of Contents states section 01 1000 Summary has 5 pages but is not included in the documents to download. Please advise. Thanks!
opcsomarygoodwin on 13-Jun-2014 2:06:37 PM CDT
Please note the addendum that was added to this listing
ConcreteBusters on 17-Jun-2014 9:32:49 AM CDT
Please clarify what type of 12? high security fence you want along Perdido st. DC100(1) calls for it to be 12? high. Do you want the fence to be built as per detail 7 page EC200(1)?
opcsomarygoodwin on 17-Jun-2014 2:32:06 PM CDT
I have forwarded your information to Mr. Croft.
opcsomarygoodwin on 17-Jun-2014 2:32:07 PM CDT
I have forwarded your information to Mr. Croft.
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
30-Jan-2015 4:40:12 PM CST
20-Jun-2014 1:31:40 PM CDT
addendum no.2 uploaded to bid package
20-Jun-2014 1:30:18 PM CDT
addendum no.2 uploaded to bid package
18-Jun-2014 12:28:45 PM CDT
corrected bid opening date to June 25, 2014 2:00pm, per addendum #1
13-Jun-2014 6:41:29 PM CDT
added notarized newspaper advertisement
13-Jun-2014 2:04:12 PM CDT
please note the addendum no. 1 added
05-Jun-2014 11:32:36 AM CDT
prebid sign sheet was added