Hurricane Laura Repairs for South Cameron High School Campus
Louisiana > Cameron Parish School System
Sealed Bid: 58728285
Listing Information/Advertisement:


Sealed bids from general contractors duly licensed pursuant to Louisiana’s Contractors Licensing Laws for the major classification of “Building Construction” are requested by Cameron Parish School Board for construction of:
 
Hurricane Laura Repairs for South Cameron High School Campus VSG Project No. 20118
 
Bids will be received at the offices of Cameron Parish School Board, 510 Marshal Street, Cameron, Louisiana 70631 until 2:00 PM., Local Time on Tuesday, May 11, 2021.
 
At which time and place the bids will be publicly opened and read aloud. Bidders have the option to submit their bids electronically by using Central Auction House (www.CentralAuctionHouse.com).
 
Complete bids docs may be obtained online at  www.CentralAuctionHouse.com or from the Architect:
 
VSG Architects, APALLC, 1502 South Huntington Street, Sulphur, Louisiana, 70663
 
Upon payment of a $ 50.00 deposit for each set of documents. The deposit or a portion of the deposit is returnable as provided by the Louisiana State Public Bid Laws. Deposit is fully refundable for the first set of documents to all bona fide prime* bidders upon return of the documents in good condition no later than ten (10) days after receipt of bids.  The deposit of all other set of documents will be refunded fifty percent (50%) upon return of documents as stated above. Electronic form may be obtained from the Project Architect upon a non-refundable $25 fee for this project.
 
The successful Bidder will be allowed 150 calendar days to complete the Project from the date established in a Notice to Proceed. Liquidated Damages will be assessed at $250.00 for each consecutive calendar day for which work is not substantially completed beyond the date set as the completion date in the Notice to Proceed.
 
Bid Documents may be reviewed at the office of VSG Architects, APALLC.
 
Bids must be accompanied by bid security equal to five percent (5%) of the base bid and all additive alternates in the form of either a certified check or a bid bond.
 
A Pre?Bid Conference will be held at 10:00 AM on April 30, 2021 at the job site South Cameron High
School, 753 Oak Grove Highway, Grand Chenier, LA. Attendance at this Pre?Bid Conference is MANDATORY.
 
The Contract, if awarded, will be on the basis stated in the Instructions to Bidders. The Non?Collusion Affidavit, the Affidavit certifying compliance with La. R.S. 38:2212.10 regarding an employee verification system, the No Convictions Affidavit required by La. R.S. 38:2227, and other required affidavits/documentation as specified in the Bid Documents must be hand delivered by the apparent low bidder within 10 calendar days of the bid opening. No bid may be withdrawn from a period of forty?five (45) days after the bid opening except as provided by law. Bidders must meet the requirements of the State of Louisiana Contractor’s Licensing laws, La. R.S. 37:2151, et seq.
 
The Cameron Parish School Board reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all bids and to waive technicalities and informalities.
 
Christi LaBove, President
Cameron Parish School Board
 
 
Charley Lemons, Superintendent
Cameron Parish School Board

SUBMITTAL INFORMATION
Creator Username: CPSBha
Bidding Privacy: Bid encryption
Started: 14-Apr-2021 12:00:00 AM CDT
Ends: 11-May-2021 2:00:00 PM CDT ( Expired )
History: 3728 Views
Event Status: Expired since 11-May-2021 2:00:00 PM CDT
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
DOWNLOAD BID DOCUMENTS
Index to Bidding and Informational Documents.pdf (59.0 KB)
READ ME - Digital Bid Document Disclaime.pdf (36.4 KB)
20118 - Project Manual and Specifications.pdf (3.6 MB)
Final Drawing Set for Hurricane Laura Repair.pdf (9.9 MB)
SCHS Field House - Re-Issued Building Construction Set.pdf (14.0 MB)
3 - C-2 Site Grading and Drainage Details.pdf (4.7 MB)
2 - C-1 Site Grading and Drainage Plan.pdf (11.0 MB)
4 - A-1 Architectural Site Plan.pdf (7.7 MB)
1 - Cover Page.pdf (13.2 MB)
5 - A-2 Ground Level Plan.pdf (5.3 MB)
7 - A-4 Second Floor Plan.pdf (5.2 MB)
9 - A-6 First Floor Plan - East Wing.pdf (7.8 MB)
6 - A-3 First Floor Plan.pdf (6.7 MB)
10 - A-7 Second Floor Plan - East Wing.pdf (7.0 MB)
8 - A-5 Enlarged Cafetorium Plan.pdf (8.5 MB)
11 - A-8 Enlarged Plans.pdf (7.5 MB)
12 - A-9 Enlarged Plans Cont'd.pdf (7.3 MB)
14 - A-11 Door Schedule Cont'd.pdf (4.5 MB)
13 - A-10 Door Schedule.pdf (5.2 MB)
15 - A-12 Door Types and Details.pdf (3.5 MB)
16 - A-13 Room Finish Schedule.pdf (5.2 MB)
17 - A-14 Finish Floor Plan and Details.pdf (6.0 MB)
18 - A-15 Interior Elevations.pdf (4.1 MB)
19 - A-16 Interior Elevations Cont'd.pdf (4.5 MB)
20 - A-17 Interior Elevations Cont'd.pdf (3.9 MB)
21 - A-18 Building Sections.pdf (9.5 MB)
23 - A-20 Wall Sections.pdf (5.5 MB)
22 - A-19 Miscellaneous Details.pdf (7.1 MB)
24 - A-21 Exterior Elevations.pdf (8.5 MB)
25 - A-22 Exterior Elevations Enlarged.pdf (12.9 MB)
27 - S-1 Pilecap Plan and Schedule.pdf (5.8 MB)
28 - S-2 Piling & Pilecap Details.pdf (4.1 MB)
26 - A-23 Exterior Elevations Enlarged Cont'd.pdf (10.4 MB)
29 - S-3 South Stair and Ramp Plans and Details.pdf (4.0 MB)
32 - S-6 First Floor Concrete Beam Schedules.pdf (19.6 MB)
30 - S-4 First Floor Concrete Beam Framing Plan.pdf (11.3 MB)
33 - S-7 First Floor Concrete Beam Schedules.pdf (19.2 MB)
31 - S-5 First Floor Concrete Beam Schedules.pdf (19.0 MB)
34 - S-8 First Floor Concrete Beam Schedules.pdf (14.2 MB)
35 - S-9 First Floor Slab Reinforcing Plan.pdf (10.8 MB)
36 - S-10 First Floor Slab Reinforcing Details.pdf (12.6 MB)
39 - S-13 Roof Framing Plan.pdf (14.9 MB)
37 - S-11 First Floor Masonry Plan and Details.pdf (12.3 MB)
38 - S-12 Second Floor Framing and Masonry Plans.pdf (12.8 MB)
40 - S-14 Structural Building Sections and Details.pdf (11.5 MB)
41 - S-15 Roof Truss Framing Elevations and Details.pdf (10.3 MB)
42 - S-16 Northeast Exterior Ramp Plans and Details.pdf (12.1 MB)
43 - S-16.1 South Bus Canopy and Northeast Exterior Stairs Plans and Details.pdf (10.8 MB)
44 - S-16.2 Northwest Exterior Stairs Plans and Details.pdf (10.4 MB)
46 - S-18 Mechanical Equipment Platform Framing Plan, Sectins, and Details.pdf (11.1 MB)
47 - PS-1 Plumbing Site Plan.pdf (10.7 MB)
45 - S-17 East Exterior Stair Framing Plan, Sections, and Details.pdf (12.2 MB)
48 - P-0 Plumbing Ground Floor Plan.pdf (11.5 MB)
51 - P-3 Enlarged Plumbing Kitchen Plan.pdf (12.8 MB)
49 - P-1 Plumbing Plan - Partial First Floor.pdf (13.1 MB)
50 - P-2 Plumbing Plan - Partial First Floor.pdf (14.1 MB)
52 - P-4 Plumbing Second Floor Plan.pdf (14.3 MB)
53 - P-5 Plumbing Fixture Schedules.pdf (15.0 MB)
55 - P-7 Plumbing Riser Diagrams.pdf (11.2 MB)
54 - P-6 Plumbing Details.pdf (13.9 MB)
56 - P-8 Plumbing Riser Diagrams.pdf (10.9 MB)
58 - M-2 HVAC Plan - Partial First Floor.pdf (16.7 MB)
57 - M-1 HVAC Plan - Partial First Floor.pdf (14.9 MB)
60 - M-4 Kitchen Hoods Exhaust Plan - First Floor.pdf (15.7 MB)
61 - M-5 HVAC Plan - Second Floor.pdf (16.0 MB)
59 - M-3 HVAC Plan - Kitchen and Cafetorium - First Floor.pdf (13.4 MB)
62 - M-6 Enlarged Mechanical Room Plans.pdf (15.3 MB)
63 - M-7 HVAC Details.pdf (12.8 MB)
66 - FPS-1 Fire Protection Site Plan.pdf (10.3 MB)
65 - M-9 HVAC Schedules.pdf (14.4 MB)
64 - M-8 HVAC Schedules.pdf (16.0 MB)
69 - FP-2 Fire Protection Plan - Partial First Floor - West.pdf (13.8 MB)
67 - FP-0 Fire Protection Plan - Ground Floor.pdf (12.1 MB)
71 - FP-4 Fire Protection Details.pdf (12.2 MB)
72 - E-1 Electrical Site Plan.pdf (12.4 MB)
68 - FP-1 Fire Protection Plan - Partial First Floor - East.pdf (13.3 MB)
73 - E-2 Power Plan.pdf (13.9 MB)
70 - FP-3 Fire Protection Plan - Second Floor.pdf (14.1 MB)
74 - E-3 Power Plan.pdf (14.3 MB)
75 - E-4 Power Plan.pdf (13.2 MB)
76 - E-5 Enlarged Power Plans.pdf (11.6 MB)
78 - E-7 HVAC Power Plan.pdf (13.3 MB)
77 - E-6 HVAC Power Plan.pdf (13.5 MB)
79 - E-8 HVAC Power Plan.pdf (12.9 MB)
80 - E-9 Lighting Plan.pdf (16.4 MB)
83 - E-12 Grade Level Electrical Plan.pdf (10.6 MB)
81 - E-10 Lighting Plan.pdf (15.3 MB)
85 - E-14 Special Systems Plan.pdf (12.6 MB)
82 - E-11 Lighting Plan.pdf (14.4 MB)
87 - E-16 Electrical One-Line Diagrams.pdf (10.8 MB)
84 - E-13 Special Systems Plan.pdf (13.4 MB)
86 - E-15 Special Systems Plan.pdf (12.4 MB)
89 - E-18 Schedules.pdf (11.5 MB)
88 - E-17 Electrical Riser Diagrams.pdf (9.8 MB)
90 - E-19 Panel Schedules.pdf (12.9 MB)
91 - E-20 Panel Schedules.pdf (13.5 MB)
92 - E-21 Panel Schedules.pdf (14.1 MB)
93 - E-22 Panel Schedules.pdf (12.1 MB)
20118 - Addendum #1 with attachments.pdf (769.8 KB)
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
06-May-2021 12:25:59 PM CDT
Addendum No. 1
06-May-2021 12:25:59 PM CDT
Addendum No. 1
21-Apr-2021 7:32:17 PM CDT
Project Manual, Dwgs, etc.
21-Apr-2021 7:24:23 PM CDT
Re-Issued Original Construction Set
14-Apr-2021 1:33:47 PM CDT
Project Manual, Dwgs, etc.