To Advertise:
1. June 2, 2024
2. June 09, 2024
ADVERTISEMENT FOR BIDS
MOB Radiation Oncology Imaging
Equipment Upgrades & Remodel
Memorial Hospital at Gulfport will receive Sealed Bids with Qualification Statements until Tuesday, July 2, 2024 at 2:00 PM for the furnishing of all labor and material and performing all work necessary and incidental to
BID #2024-0702, MOB Radiation Oncology Imaging Equipment Upgrades and Remodel, in accordance with Drawings and Project Manual.
SCOPE: Generally, the scope of work consists of demolition of the existing area and construction within the MOB Radiation Oncology Imaging Department area. This is a phased project consisting of two (2) phases, with each phase receiving new equipment, including new finishes within the spaces. All work is complete with all materials, labor, structural, plumbing, fire protection, mechanical, and electrical work, etc. as indicated in the drawings and as specified. This project includes Owner Purchased, Contractor Installed equipment, pre-ordered to assist with delivery schedule. Coordination with Owner will be necessary for scheduling the delivery and installation of the Owner’s Equipment to ensure that areas are completely ready for Owner’s equipment arrival.
The above Scope of Work will be performed while areas outside of the limits of the Work are occupied. Strict conformance to Infection Control guidelines, construction noise abatement, and ability to organize work with flexible hours and manage disruption in continuity of work is vital to the successful completion of the project. Bidders shall be able to prove and demonstrate the ability to perform this Scope of Work in these restrictive environments and shall be able to prove experience in the Healthcare environment within the last five (5) years. Bidders may meet this requirement by assigning to the project, a team in which the members are able to demonstrate their healthcare abilities and qualifications including but not limited to Infection Control Risk Assessment (ICRA) experience. Owner reserves the right to review qualifications of Bidders prior to award of Contract.
Work shall be completed as follows:
Phase 1: One Hundred Twenty (120) Calendar Days from Notice to Proceed.
Phase 2: One Hundred Twenty (120) Calendar Days from Notice to Proceed.
Liquidated damages of One Thousand Dollars ($1,000.00) per day shall apply for non-compliance. A Performance and Payment Bond will be required of the successful bidder.
BIDS:
Official Bid Documents can be downloaded from Central Bidding at www.centralbidding.com. Electronic bids can be submitted at www.centralbidding.com. Electronic bids shall be submitted at or before 2:00 p.m. on bid date. For any questions relating to electronic bidding process, please call Central Bidding at 225-810-4814.
Also, complete Bidding Documents for this project are available in electronic form for downloading, without charge and without deposit, by requesting an electronic set of documents through the project bidding email address:
[email protected].
Printed copies are not available from the Architect, but arrangements can be made to obtain them through most reprographic firms. Plan holders are responsible for their own reproduction costs.
Bids submitted by mail must be addressed to:
Memorial Hospital at Gulfport
P.O. Box 1810, Gulfport, MS 39502
Attention: Greg Quigley, Director of Engineering, Engineering Department.
Bids submitted by delivery services, such as FedEx or UPS, must be delivered before 1:45 p.m. on bid date and shall be addressed to:
the office of Greg Quigley, Director of Engineering, Engineering Department
Memorial Hospital at Gulfport
4500 13TH Street, Gulfport, MS 39501;
Bids hand delivered before 1:45 p.m. on bid date shall be delivered to:
the office of Greg Quigley, Director of Engineering, Engineering Department
Memorial Hospital at Gulfport
4500 13TH Street, Gulfport, MS.
Bids hand delivered between 1:45 p.m. and 2:00 p.m. on bid date shall be delivered to:
Large Engineering Conference Room on the Second Floor at
Memorial Hospital at Gulfport
4500 13TH Street, Gulfport, MS.
All bids will be publicly opened and read aloud at MEMORIAL HOSPITAL at GULFPORT, LARGE ENGINEERING CONFERENCE ROOM ON THE SECOND FLOOR at 2:00 P.M. on Tuesday, JULY 2, 2024.
Instructions to Bidders, Drawings and Project Manual, and other documents pertaining to construction of this project, may be reviewed only, in person, beginning Tuesday, June 4, 2024, at the following location:
· Memorial Hospital at Gulfport – Engineering Department – Call 228-865-3056 to schedule a time to review hardcopy of Drawings and Project Manual.
· No verbal questions may be asked and none will be answered.
· All bidding questions must be submitted through the Bidding Email:
[email protected].
To assist Bidders during the bid period, one (1) Mandatory Pre-Bid Conference and Site Visit will be held at Memorial Hospital at Gulfport at 4:30 p.m. on Wednesday June 12, 2024 in the Rad-Oncology Conference Room on the 1st Floor of the Medical Office Building (MOB), with a site visit immediately following. Although it is mandatory for General Contractors to attend both the Pre-Bid Conference and the Site Visit, Mechanical and Electrical Subcontractors who wish to bid the project are encouraged to attend both the Pre-Bid Conference and the Site Visit.
Bid security of five percent (5%) of the total amount of Base Bid and all Alternate Bids shall be submitted with each bid as provided in the Instructions of Bidders.
Bids shall be submitted in sealed opaque envelopes. Envelopes shall be clearly marked as follows:
“SEALED BID: Memorial Hospital at Gulfport
Mob Radiation Oncology Imaging Equipment Upgrades & Remodel
Bid #2024-0702
Bidders must indicate Certificate of Responsibility Number on the outside of the sealed envelope.
NOTE: No Bids (electronically submitted, mailed, delivered by delivery service or hand delivered) shall be accepted after times indicated.
The Board of Trustees of Memorial Hospital at Gulfport reserves the right to reject all bids and to waive any formality. Attention should be directed to the fact that Memorial Hospital at Gulfport is a publicly owned hospital and subject to Mississippi State Laws related to bidding. No bidder may withdraw his bid for a period of ninety (90) days after the date set for opening thereof.
No bid shall be considered awarded until such time as all contract documents have been signed and received by both parties.
END OF SECTION 00 1000
To assist Bidders during the bid period, one (1) Mandatory Pre-Bid Conference and Site
Visit will be held at Memorial Hospital at Gulfport at 4:30 p.m. on Wednesday June 12, 2024
in the Rad-Oncology Conference Room on the 1st Floor of the Medical Office Building
(MOB), with a site visit immediately following. Although it is mandatory for General
Contractors to attend both the Pre-Bid Conference and the Site Visit, Mechanical and
Electrical Subcontractors who wish to bid the project are encouraged to attend both the
Pre-Bid Conference and the Site Visit.