St. Mary Parish School Board is taking bids for student lockers for Franklin Sr. High School. Bids for student lockers will include the furnishing and installation of new steel lockers, accessories, finish metal trim, sloped tops, metal bases and built in combination locks as indicated below:
175 frames, 12" X 12" X 36" double tier (350 total openings) with bases and continuous sloped top. Each opening to be equipped with one double prong ceiling hook, two single prong coat hooks, and a Master # 1630 built-in combination lock keyed to the existing control system. Doors to be BLACK in color and frames to be MAROON. Some filler strips may be nevessary.
Lockers to be delivered, assembled, and installed by successful bidder during summer break starting May 27, 2024, and completed before July 21, 2024. The installation time will be coordinated with Franklin Sr. High School Principal.
St. Mary Parish School Board will remove existing lockers.
PROJECT LOCATION
Franklin Sr. High School
1401 Cynthia Street
Franklin, La. 70538
CONTACT PERSON
Brad Wiese
Supervisor of Maintenance
St. Mary Parish School Board
474 Highway 317
P.O. Box 170
Centerville, La. 70522
337-836-9605
[email protected]Sepcifications are considered the minimum accepted standard. The primary bid shall be as specified in the attached documents.
The St. Mary Parish School Board reserves the right to accept or reject any or all bids, to waive any informalities or to award the contract to other than the lowest bidder, whichever is in the best interest of the School System.