OFFICE OF STATE AID ROAD CONSTRUCTION
MISSISSIPPI DEPARTMENT OF TRANSPORTATION
AND
PEARL RIVER COUNTY BOARD OF SUPERVISORS
SECTION 900
NOTICE TO CONTRACTORS:
Sealed bids will be received by the Board of Supervisors of Pearl River County, Mississippi at the Pearl River County Administrator's Office, Poplarville, Mississippi, until 1:00 PM on the 21st day of June, 2022 and shortly thereafter publicly opened for the construction of 25.581 miles of MAINTENANCE (OTHER THAN BRIDGE) on ROADS "A" THRU "F" being known as Project No. SAP-55(26)M in Pearl River County, Mississippi. Electronic bids can be submitted at www.centralbidding.com. For any questions relating to the electronic bidding process, please call 225-810-4814.
PRINCIPAL ITEMS OF WORK ARE APPROXIMATELY AS FOLLOWS:
ITEM QUANTITY UNIT
ROADWAY ITEMS: MOBILIZATION LUMP SUM LS
REMOVAL OF PIPE (ALL SIZES) 56.000 LF
UNCLASSIFIED EXCAVATION (FM) 50.000 CY
UNCLASSIFIED EXCAVATION (FM) 499.000 CY
STRUCTURE EXCAVATION 100.000 CY
GRANULAR MATERIAL (LVM), 374.000 CY
(CLASS 6, GROUP C)
CRUSHED STONE 610 100.000 TON
SIZE II STABILIZER AGGREGATE, 25.000 CY
COARSE
HOT MIX ASPHALT, ST 9.5 MM 4,639.000 TON
HOT MIX ASPHALT, ST 9.5 MM, 494.000 TON
(BASE REPAIR)
HOT MIX ASPHALT, ST 9.5 MM, 777.000 TON
LEVELING
COLD MILLING OF BITUMINOUS 6,064.000 SY
PAVEMENT, ALL DEPTHS
CLASS "B" STRUCTURAL CONCRETE, 0.290 CY
MINOR STRUCTURES
58" X 36" REINFORCED CONCRETE 56.000 LF
ARCH PIPE, CLASS III
58" X 36" REINFORCED CONCRETE 2.000 EA
ARCH PIPE, END SECTION
MAINTENANCE OF TRAFFIC LUMP SUM LS
ADDITIONAL CONSTRUCTION SIGNS 0.000 SF
4" WIDE THERMOPLASTIC EDGE STRIPE 8.825 MI
(CONTINUOUS WHITE) (60 MILS)
4" WIDE THERMOPLASTIC TRAFFIC 2.025 MI
STRIPE (SKIP YELLOW) (90 MILS)
4" WIDE THERMOPLASTIC TRAFFIC 33,685.000 LF
STRIPE (CONTINUOUS YELLOW)
(90 MILS)
THERMOPLASTIC LEGEND 990.000 LF
(WHITE) (120 MILS)
THERMOPLASTIC LEGEND 227.000 SF
(WHITE) (120 MILS)
TWO-WAY YELLOW REFLECTIVE HIGH 434.000 EA
PERFORMANCE RAISED MARKERS
EROSION CONTROL ITEMS: AGRICULTURAL LIMESTONE 0.200 TON
COMMERCIAL FERTILIZER (13-13-13) 0.100 TON
SEEDING 0.100 AC
VEGETATIVE MATERIALS FOR MULCH 0.200 TON
TEMPORARY SILT FENCE 100.000 LF
(TYPE II) (AOS 0.15-0.84)
WATTLES, 20" 40.000 LF
LOOSE RIPRAP, 200 LB. 10.000 TON
GEOTEXTILE UNDER RIPRAP NON-WOVEN, 20.000 SY
TYPE V, AOS (0.21-0.43)
PROJECT NO. SAP-55(26)M
PEARL RIVER COUNTY
NOTICE TO CONTRACTORS:
CONTRACT TIME: 60 Working Days
BASIS OF AWARD
The award, if made, will be made to the lowest qualified bidder on the basis of published quantities.
The Board of Supervisors hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprise will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
PLANS AND SPECIFICATIONS are on file in the Office of the Chancery Clerk of Pearl River County, the County Engineer's office and the Office of the State Aid Engineer, 412 E. Woodrow Wilson Avenue, Jackson, Mississippi. This project shall be constructed in accordance with the latest edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction.
PLANS AND PROPOSALS may be secured from H. Les Dungan, III, County Engineer for Pearl River County, Mississippi, 925 Goodyear Blvd, Picayune. The Cost is fifty dollars ($50.00) for plans and fifty dollars ($50.00) for the proposal, non-refundable. Or official bid documents can be downloaded from Central Bidding at www.centralbidding.com.
Certified check or bid bond for five percent (5%) of the total bid, made payable to Pearl River County and the State of Mississippi must accompany each proposal.
Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid and such proposal will not be considered in making the award.
Sandy Kane Smith, President
Pearl River County Board of Supervisors
Publish on:
May 13, 2022
May 20, 2022