DCS DESOTO CENTRAL HS ADDITION
Mississippi > Desoto County School District
Solicitation: 39772151
Listing Information/Advertisement:


The project consists of construction of a new 40,448 SF, two story 9th grade classroom building at the Desoto Central High School in Southaven, MS. The new building is situated adjacent to the existing school and is connected via a new, single-story corridor. The addition has associated site and demo work which includes grading, paving, drainage, utilities, and other related work as shown on the drawings and/or described in the specifications

SUBMITTAL INFORMATION
Creator Username: DCSDSC
Bidding Privacy: Bid encryption
Started: 09-Sep-2019 12:00:00 AM CDT
Ends: 08-Oct-2019 2:00:00 PM CDT ( Expired )
History: 681 Views
Event Status: Expired since 08-Oct-2019 2:00:00 PM CDT
Actions: Sign-In to Bid
Username:

Password:
Visitors: Visitors/Central Bidding Plan Holders
DOWNLOAD BID DOCUMENTS
Project Manual DCS Desoto Central HS Addition 09052019.pdf (52.7 MB)
9-5-19 Bid Set.pdf (38.5 MB)
E001.pdf (349.6 KB)
DCS Central HS Addition - ADDENDUM NO 1 09182019.pdf (323.1 KB)
E101.pdf (415.2 KB)
E002.pdf (431.2 KB)
E201.pdf (393.0 KB)
E301A.pdf (338.8 KB)
E301B.pdf (435.8 KB)
E202.pdf (373.1 KB)
E003.pdf (2.9 MB)
E302A.pdf (359.7 KB)
E401.pdf (370.0 KB)
E403.pdf (257.9 KB)
E302B.pdf (407.3 KB)
E402.pdf (394.2 KB)
E501B.pdf (323.5 KB)
E501A.pdf (304.3 KB)
E502B.pdf (354.6 KB)
E502A.pdf (323.4 KB)
ED101.pdf (357.0 KB)
1- 009113 - ADDENDUM NO 2.pdf (23.2 KB)
2 - 000004 - LIST OF DRAWINGS.pdf (16.0 KB)
3 - 003000 - INFORMATION AVAILABLE TO BIDDERS.pdf (11.3 KB)
5 - 064116 FL - PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS.pdf (32.9 KB)
6 - 085113 FL - ALUMINUM WINDOWS.pdf (31.2 KB)
8 - 102113 - PLASTIC TOILET COMPARTMENTS.pdf (27.1 KB)
7 - 092900 FL - Gypsum Board.pdf (41.9 KB)
9 - 123623 - PLASTIC LAMINATE-CLAD COUNTERTOPS.pdf (26.1 KB)
10 - 237219 FL - Fixed Plate Air-to-Air Energy Recovery Units.pdf (33.0 KB)
11 - 237433 - DEDICATED OUTDOOR AIR UNITS.pdf (71.0 KB)
12 - 238200 - PACKAGED ROOFTOP HEAT PUMP UNITS.pdf (61.5 KB)
M0-1 - GENERAL NOTES & LEGENDS - MECHANICAL.pdf (104.8 KB)
Arch Sheets.pdf (1.9 MB)
M1-1 - ORIGINAL BUILDING FIRST FLOOR DEMOLITION & NEW WORK PLANS - MECHANICAL.pdf (176.4 KB)
M2-2 - NEW BUILDING SECOND FLOOR PLAN - MECHANICAL.pdf (381.8 KB)
4 - 003000 - GEO REPORT DCHS 9th Grade Addition.pdf (4.8 MB)
M2-3 - NEW BUILDING ROOF PLAN - MECHANICAL.pdf (122.9 KB)
M3-1 - SCHEDULES - MECHANICAL.pdf (195.7 KB)
S-SHEETS ADD2.pdf (2.0 MB)
1- 009113 - ADDENDUM NO 3.pdf (19.3 KB)
2 - 000004 - LIST OF DRAWINGS.pdf (16.1 KB)
E003 - PANEL SCHEDULES - ELECTRICAL.pdf (3.0 MB)
E301A - PARTIAL FIRST FLOOR PLAN - POWER AND COMMUNICATIONS.pdf (938.5 KB)
Addendum 3- Arch Sheets.pdf (1.1 MB)
E302A - PARTIAL SECOND FLOOR PLAN - POWER AND COMMUNICATIONS.pdf (1.0 MB)
E302B - PARTIAL SECOND FLOOR PLAN - POWER AND COMMUNICATIONS.pdf (721.8 KB)
E403 - ROOF PLAN - MECHANICAL EQUIPMENT - ELECTRICAL.pdf (295.7 KB)
LV1-1.pdf (4.7 MB)
LV1-2.pdf (4.1 MB)
S-SHEETS- ADD03.pdf (1.9 MB)
E301B - PARTIAL FIRST FLOOR PLAN - POWER AND COMMUNICATIONS.pdf (705.2 KB)
1- 009113 - ADDENDUM NO 4.pdf (14.5 KB)
LV1-2.pdf (4.0 MB)
LV1-1.pdf (4.7 MB)
UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
04-Oct-2019 1:23:29 PM CDT
Addendum No. 4 October 4, 2019
02-Oct-2019 4:42:40 PM CDT
ADDENDUM NO 3 - OCTOBER 2, 2019
25-Sep-2019 4:42:05 PM CDT
ADDENDUM NO 2 SEPTEMBER 25, 2019
18-Sep-2019 5:39:43 PM CDT
ADDENDUM NO 1 SEPTEMBER 18, 2019