A NON-MANDATORY Pre-Bid Meeting will be held on Thursday, March 26, 2015 at 10:00:00 a.m. C.S.T. for all interested parties.
Summary of Project: The project includes but not limited to the following: Construction of new
parking lot, subsurface drainage, paving, curbing, piling, concrete and structural steel, Pylon
Signs, Landscaping, Landscape Irrigation, pay booths for parking, signage, metal panels, within
an existing operating prison, including ramps, stairs, handrails, built equipment and gates,
metal fencing, security hardware, security systems, CCTV cameras, painting, lighting and
electrical work.
Bid Documents will be also be available on-line at http://login.projecttrek.com/BiddingLogin.aspx.
On 3/17/15 was notified by D. Payton of Barre Construction that the advertisement section was not included in the specifications for the bid. Mr. Croft has been notified of this omission.