Snow Hinton Park - Site Improvements Phase One
Alabama > City of Tuscaloosa
Sealed Bid: 36340786
Listing Information/Advertisement:


CITY OF TUSCALOOSA
ADVERTISEMENT FOR BIDS
 
Project Name: Snow Hinton Park - Site Improvements Phase One
File Number: OCA-23-0682    Engineering Project Number: 2020.021.001
 
Sealed Bid Proposals will be received by the City of Tuscaloosa, at the Council Chamber of City Hall, 2201 University Boulevard, on August 17, 2023, at 11:00 am local time for this project, at which time bids will be opened and read.
 
Pre-Bid Conference: Attendance at the MANDATORY Pre-Bid Conference is required in order for a General Contractor to submit a bid on this Project. The Pre-Bid Conference will be held at the Council Chamber of City Hall, 2201 University Boulevard, on August 3, 2023, at 11:00 am local time.
 
Project Scope: Improvements, renovations, and additions to existing Snow Hinton Park including restroom building; maintenance building; group pavilion; picnic pavilions; shade arbors; parking lot reconfiguration; pedestrian pathways of asphalt, concrete, pavers; seat walls and planter walls; site furniture; site electrical service, security, Wi-Fi, lighting for pedestrian, parking, landscape areas; utility for water, storm, sanitary, electrical; mass and fine grading; plant material; irrigation.    
                                                                                                                                            
Award of the contract will be made within forty-five (45) calendar days from the date of the bid opening.
 
Plans and Specifications:  Plans and specifications and all related Contract Documents are open for public inspection at the office of Infrastructure and Public Services Administration, located at 2201 University Blvd., Tuscaloosa, Alabama and  plans,  specifications  and  other  elements  of  the  contract  documents  may  be  obtained  from  the  office  of  the Engineer Barge Design Solutions, Inc., designated as the office of the awarding authority for this purpose, located at  3535 Grandview Parkway, Suite 500, Birmingham, AL 35243.  The contact person for the project is Steve Provost.  They can be reached at 205-298-1763.
 
Official Bid Documents can also be downloaded at www.centralbidding.com. Electronic Bids can be submitted at www.centralbidding.com. For any questions about the electronic bidding process, please contact Central Bidding at 225-810-4814 or [email protected].

 

UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
21-Aug-2023 10:58:15 AM CDT
Added Addendum 4 Files: 'Snow Hinton Park - Phase One Improvements - Addendum No 4.pdf' and 'Addendum No 4 - Attachment 2 - Bid Form.xlsx'
17-Aug-2023 10:37:25 AM CDT
Added Addendum 3 File: 'Snow Hinton Park - Phase One Improvements - Addendum No 3.pdf'
16-Aug-2023 4:46:56 PM CDT
SPECIAL NOTICE: The Bid Opening for Snow Hinton Park ? Site Improvements Phase One scheduled for Thursday, August 17, 2023 at 11:00 am local time is hereby rescheduled for Thursday, August 24, 2023 at 11:00 am local time. The location of the Bid Opening has not changed. Addendum #3 is forthcoming.
14-Aug-2023 9:17:55 PM CDT
Added Addendum 2 File: 'Snow Hinton Park - Phase One Improvements - Addendum No 2.pdf'
09-Aug-2023 4:35:19 PM CDT
Added Addendum 1 Files: 'Snow Hinton Park - Phase One Improvements - Addendum No 1.pdf' and 'Addendum 1_Attachment 3 - Snow Hinton Park Bid Form.xlsx'
31-Jul-2023 2:39:05 PM CDT
Studies and Reports - The following studies / reports are available for review. The bidders are strongly encouraged to obtain and become familiar with these documents. These documents are for information only and are not considered contract documents. The City and/or the Architect/Engineer shall not be responsible for any interpretations or conclusions drawn from these documents by the bidders. a. Geotechnical Report prepared by TTL, Inc. dated August 2, 2022 b. Report of Phase I Environmental Site Assessment prepared by TTL, Inc. dated June 24, 2022. c. Aquatic Resources Delineation Report Revision 1 prepared by TTL, Inc. dated July 1, 2022.
31-Jul-2023 2:37:41 PM CDT
Studies and Reports ? The following studies / reports are available for review. The bidders are strongly encouraged to obtain and become familiar with these documents. These documents are for information only and are not considered contract documents. The City and/or the Architect/Engineer shall not be responsible for any interpretations or conclusions drawn from these documents by the bidders. a. Geotechnical Report prepared by TTL, Inc. dated August 2, 2022 b. Report of Phase I Environmental Site Assessment prepared by TTL, Inc. dated June 24, 2022. c. Aquatic Resources Delineation Report Revision 1 prepared by TTL, Inc. dated July 1, 2022.
31-Jul-2023 10:03:47 AM CDT
CADD File Update
27-Jul-2023 1:42:28 PM CDT
Update 7/27/23: Electronic File Release & CADD File Uploaded.
27-Jul-2023 11:43:55 AM CDT
Update 7/27/23: Electronic File Release & CADD File Uploaded.
24-Jul-2023 9:23:33 PM CDT
Update 7/24/2023: Project Manual added