${amount}
The work on this project consists of removing an existing timber bulkhead water control structure and replacing it with 2 aluminum flashboard risers with 36’ culverts supplied and installed by the contractor. Additionally, another structure is to be installed through an existing levee consisting of timber supported vinyl sheet piling, 2 aluminum flashboard risers, and corrugated HDPE pipe supplied by DU. One structure shall be installed without dewatering (WCS#1), and one wall shall be installed while the site is dewatered (WCS#2). The Contractor shall be responsible for any necessary pollution control measures. The unit price bid for the project shall be payment in full for supplying all materials, equipment, labor and any other necessary incidental items necessary for performing all operations described herein. Contract completion time is 75 calendar days.