Notice is hereby given that the Bienville Parish School Board will receive sealed bids from LA licensed general contractors until 2:00 P.M. local time, Tuesday July 31st, 2018 for:
JOB #2018-04 ATHLETIC IMPROVEMENTS FOR
ARCADIA HIGH SCHOOL
ARCADIA, LOUISIANA
Bids will be accepted until the date and time specified and will be publicly opened and read aloud at that time in the School Board=s Central Office, 1956 First Street, Arcadia, Louisiana 71001. All submittal packages will be stamped or marked to acknowledge timely receipt. Sole responsibility for proper mailing or delivery of any bid in compliance with this advertisement is that of the bidder. Bids received after the date and time of opening will not be considered.
A non-mandatory Pre-bid Conference will be held at 10:00 A.M. on Monday, July 23rd, 2018 at Arcadia High School, 967 Daniel Street, Arcadia, LA 71001; check in at the office.
All bids must be accompanied by bid security equal to five percent (5%) of the base bid and all alternates and must be in the form of a certified check, cashier's check or bid bond written by a company licensed to do business in the State of Louisiana.
Complete bid documents may be obtained from Yeager, Watson & Associates, Inc., An Architectural Corporation, 808 Versailles Boulevard, Alexandria, LA 71303-2377, (318) 445-2446, upon deposit of $100.00 for each set of documents. The deposit is fully refundable to all planholders upon return of the documents, in good condition, no later than fifteen (15) days after receipt of bids. The deposit of all other sets of documents will not be refunded. Bid related materials & electronic submittal of bids may also be found at:
WWW.CENTRALBIDDING.COM.
The Bienville Parish School Board does not discriminate on the basis of race, color, national origin, sex, age, handicapping condition, or veteran status.
The Bienville Parish School Board reserves the right to reject any and all bids for cause as provided for and described in LA R.S. 38:2214 and to waive any informalities incidental thereto.
/s/ William Wysinger
/t/ William Wysinger, Superintendent
Bienville Parish School Board
Publication Dates:
28 June 2018
05 July 2018
12 July 2018
A/E opinion of probable construction cost is $1,500,000.00