Engineer's Canal Pump Station Improvements
Louisiana > St. Charles Parish Government
Sealed Bid: 25974258
Listing Information/Advertisement:



The Engineer’s Canal Pump Station and Discharge was constructed under an easement from the U.S. Army Corps of Engineers, which authorized the construction, operation, and maintenance of the work adjacent to the Bonnet Carre Spillway. The work in this project involves modifications to the existing pump station and discharge, and generally consists of: furnishing and installing one (1) new 26” Direct Drive Mixed Flow Submersible Pump with 200-HP Electric Motor, and associated mechanical work; removing existing generator and furnishing and installing one (1) new 750-kW Diesel Generator and associated electrical work; 26” diameter steel pipe bolted to concrete pipe anchors; associated concrete work at the pump station and discharge; and establishing all new electrical connections and controls; all while maintaining the two (2) existing pumps in place and operating during the entire construction.The Engineer’s Canal Pump Station and Discharge was constructed under an easement from the U.S. Army Corps of Engineers, which authorized the construction, operation, and maintenance of the work adjacent to the Bonnet Carre Spillway. The work in this project involves modifications to the existing pump station and discharge, and generally consists of: furnishing and installing one (1) new 26” Direct Drive Mixed Flow Submersible Pump with 200-HP Electric Motor, and associated mechanical work; removing existing generator and furnishing and installing one (1) new 750-kW Diesel Generator and associated electrical work; 26” diameter steel pipe bolted to concrete pipe anchors; associated concrete work at the pump station and discharge; and establishing all new electrical connections and controls; all while maintaining the two (2) existing pumps in place and operating during the entire construction.



 

UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
07-Mar-2019 7:38:49 AM CST
Addendum No. 3 uploaded.
04-Mar-2019 11:59:44 AM CST
Addendum No. 2 uploaded.
26-Feb-2019 9:18:51 AM CST
Uploaded Addendum No. 1.
05-Feb-2019 8:52:07 AM CST
Re-uploaded original plans