ADVERTISEMENT FOR BIDS – 5C-ICU-C EXPANSION – 5TH FLOOR PATIENT TOWER
                                                  & WEST TOWER                                         

 

Memorial Hospital at Gulfport will receive Sealed Bids with Qualification Statements until Tuesday,            March 3, 2020 at 2:00 PM for the furnishing of all labor and material and performing all work necessary and incidental to BID # 2020-0303, 5C-ICU-C EXPANSION – 5TH FLOOR PATIENT TOWER & WEST TOWER, MEMORIAL HOSPITAL at GULFPORT,  in accordance with plans and specifications.  

SCOPE:    Generally, the scope of work consists of remodeling the Existing Wing 5C of the Patient Tower and portions of the 5th floor of the West tower, to house a new ICU Unit and Waiting Room including but not limited new walls, mechanical, electrical, and plumbing items, equipment, and finishes throughout the areas. All work is complete with all materials, labor, structural, mechanical, plumbing, and electrical work, etc. as indicated in the drawings and as specified. 

The above Scope of Work will be performed while areas outside of the limits of the Work are occupied.  Strict conformance to Infection Control guidelines, construction noise abatement, and ability to organize work with flexible hours and manage disruption in continuity of work is vital to the successful completion of the project. Bidders shall be able to prove and demonstrate the ability to perform this Scope of Work in these restrictive environments and shall be able to prove experience in the Hospital environment within the last five (5) years. Bidders may meet this requirement by assigning to the project, a team in which the members are able to demonstrate their healthcare abilities and qualifications including but not limited to Infection Control Risk Assessment (ICRA) experience. Owner reserves the right to review qualifications of Bidders prior to award of Contract. 

Work shall be completed in Three Hundred and Four (304) Calendar Days. Liquidated damages of One Thousand Dollars ($1000.00) per day shall apply for non-compliance. A Performance and Payment Bond will be required of the successful bidder. 

BIDS:    

Official Bid Documents can be downloaded from Central Bidding at www.centralbidding.com.  Electronic bids can be submitted at www.centralbidding.com. For any questions relating to electronic bidding process, please call Central Bidding at 225-810-4814. 

Also, complete Bidding Documents for this project are available in electronic form, without charge and without deposit,  by requesting an electronic set of documents through the project bidding email address:

[email protected]

Printed copies are not available from the Architect, but arrangements can be made to obtain them through most reprographic firms.  Plan holders are responsible for their own reproduction costs. 

Bids submitted by mail must be addressed to:  Memorial Hospital at Gulfport, P.O. Box 1810, Gulfport, MS 39502,  Attention:  Greg Quigley, Director of Engineering, Engineering Department. 

Bids hand delivered before 1:45 p.m. on bid date shall be delivered to the office of Greg Quigley, Director of Engineering, Engineering Department, Memorial Hospital at Gulfport, 4500 13TH Street, Gulfport, MS 39501.  

Bids hand delivered between 1:45 p.m. and 2:00 p.m. on bid date shall be delivered to the Large Engineering Conference Room on the Second Floor at Memorial Hospital. 

All bids will be publicly opened and read aloud at MEMORIAL HOSPITAL at GULFPORT, LARGE ENGINEERING CONFERENCE ROOM ON THE SECOND FLOOR at 2:00 P.M. on Tuesday,                    March 3, 2020. 

Instructions to bidders, plans and specifications, and other documents pertaining to construction of this project, may be reviewed only, beginning Tuesday, January 28, 2020, at the following location: 

Memorial Hospital at Gulfport – Engineering Department – Call 228-865-3056 to schedule a time to review hardcopy of specifications and plans.

No verbal questions may be asked and will not be  answered.   

All bidding questions must be submitted through the Bidding Email:

[email protected]

To assist Bidders during the bid period, one (1) Mandatory Pre-Bid Conference and Site Visit will be held at Memorial Hospital at Gulfport at 10:00 A.M. on Wednesday, February 12, 2020, in the Large Engineering Conference Room on the 2nd Floor of MHG, with a walk-through immediately following. Although it is mandatory for General Contractors to attend pre-bid conference and site visit, Mechanical and Electrical Subcontractors who wish to bid the project are encouraged to attend the Pre-Bid Conference and Site Visit. Attendance at the Pre-Bid Conference will be considered compliance to this requirement.  Attendance at Pre-Bid Conference and Site Visit is required by all General Contractors bidding on project. 

Bid security of five (5%) for the amount of bid shall be submitted with each bid as provided in the Instructions of Bidders. 

Bids shall be submitted in sealed opaque envelopes. Envelopes shall be clearly marked SEALED BID: MEMORIAL HOSPITAL at GULFPORT - 5C-ICU-C EXPANSION – 5TH FLOOR PATIENT TOWER & WEST TOWER #2020-0303.   

 

Bidders must indicate Certificate of Responsibility Number on the outside of the sealed proposal. 

NOTE:  No Bids (electronically delivered or hand delivered) Shall Be Accepted After 2:00 pm 

The Board of Trustees of Memorial Hospital at Gulfport reserves the right to reject all bids and to waive any formality. Attention should be directed to the fact that Memorial Hospital at Gulfport is a publicly owned hospital and subject to Mississippi State Laws related to bidding.  No bidder may withdraw his bid for a period of ninety (90) days after date set for opening thereof. 

No bid shall be considered awarded until such time as all contract documents have been signed and received by both parties. 

END OF SECTION 00 1000

 

UPDATE/ADDENDUM HISTORY
All updates/changes are listed below::
28-Feb-2020 12:56:34 PM CST
Uploaded Addendum's #4 and 5
25-Feb-2020 11:12:18 AM CST
Uploaded Addendum #3.
19-Feb-2020 1:55:16 PM CST
Uploaded Addendum #2 1808J 19 FEB 2020
03-Feb-2020 3:11:37 PM CST
Uploaded Addendum #1.
27-Jan-2020 1:22:04 PM CST
Uploaded Project Manual, Volume 1 Construction Drawings and Volume 2 Reference Drawings as of today 27 Jan 2020